Sl.No. | Name of Work | L.O.A/W.O./C.A No. & Date | Contract Value (In Rs.) | Remarks |
---|---|---|---|---|
1 | Supply, Erection, Modification, Testing & Commissioning and preparation of approved as built drawings of S&T and Over Head Electric work at new Private Railway siding at Amta under Kharagpur Division of South Eastern Railways to serve M/s. Naresh Kumar & Co. Pvt. Ltd. | NKCPL/PSE/2018-19 (S&T , OHE) | 19 Crores | Work in Progress |
2 | Execution of Railway siding work consisting of earthwork in cutting, disposing of excavated soil with all lead & lifts, supply and spreading of ballast, supply of P – way materials, Laying and linking of railway track, construction of bridges, work for entire siding in In Plant siding take off from Jhakhapura station in khurda division of east cost railway for the proposed large Cement Plant at Kalinga Nagar Industrial Complex (KNIC) Village – Mnitira under P.S Jhakhapura, Back Side of Maithan Steel, Tehsil Danagadi, Dist Jajpur, Odisha – 755019. | ECL/Odisha/LOI/Railway/HO/17 – 18/001 dated 19.12.2017 (Civil) | 28 Crores | Work in Progress |
3 | Design, Engineering, Procurement, Manufacturing, Inspection, Testing as per approved QAP/ITP, Packing, Loading Forwarding, Transportation including transit insurance, supply to site, unloading, stacking & storage at site, storage insurance, handing, liaising, dismantling, linking, civil work, erection, pre-commissioning & commissioning, performance trials to prove the agreed performance parameters for modification of railway siding inside the Nuvoco Plant premises to enhance the capacity and rationalization for optimization of handling movements of traffic at Tata Nagar station at Chakradharpur Division, South Eastern Railway, for Jojobera Plant of Nuvoco Vistas Corp. Ltd. (NVCL), Refer Annexure-I attached herewith for detailed scope of work. | NVCL/JCP/PICASONA/53/08/03 Dated: 08.03.2019 (Civil) | 13.51 Crores | Work in Progress |
4 | Construction of 4th Railway Line and other associated job at Kharagpur works of M/s Tata Metaliks Limited. | P.O. No.: 670346 Date: 12.10.2018 (Civil & OHE) | 9.20 Crore | Work in Progress |
5 | Design, Supply, Erection, Testing & Commissioning of Railway Electrification work of Exiting/Proposed Tracks of 25 KV AC,50Hz single phase OHE for Railway Siding of South connectivity at TATA Steel Plant (Kalinganagar) | WO No. 3800015814/118 Dt. 09.10.2019 (OHE) | 8.81 Crore | Work in Progress |
6 | Railway siding work (P-way work, Bridge & FOB extension including relay room to construct of one loop line including re-grading and remodeling station work at Lakholi under Raipur Division of South East Central Railway) as per Tender documents IOTECS/ATF-RAIPUR/RAILWAY SIDING/01 dated 25th January 2019 & SOQR & as per Annexure I. | IOTECS/RAIPUR/RAILWAYSIDING/LOI-01 Dated: 03.04.2019 (Civil) | 6.15 Crores | Work in Progress |
7 | Signalling (Electronic Interlocking) work at Kalinarayanpur in connection with Bridge work and residual work of doubling in Sealdah Division of Eastern Railway. | LOA No.:SG.42/Con/Tender/EI-KLNP Dt. 05.11.2018 (Signalling) | 6.46 Crore Revised Value 7.89 Corer (under Vetting) | Work in Progress 80% work completed Target date of commissioning 30.09.2019 |
8 | Supply of material (partly), installation, testing, interlocking & commissioning of indoor and outdoor signalling equipments by electronic interlocking at Gede station in sealdah division of Eastern Railway. | LOA NO. ER HQ-S AND T / SGW-272-147-T1-43 / 00901480008663 Dated 24.10.2019 (Signalling) | 5.53 Crore | Work in Progress |
9 | Letter of Intent for Ultratech Cement Ltd. Dankuni Railway Siding Shunting Neck Extension & Direct Reception of Rake through Signal & Telecommunication in inside plant for direct reception. | UTCL/CPC/AEB/DKCW/LOI-01/19-20 Dated: 20.05.2019 (Signalling) | 4.35 Crores | 20% Work completed balance in Progress |
10 | Work of Trenching & Laying of U/G Signaling Cable/ Power Cable, Casting of Foundation, Supply of Equipments / Materials, Erection of Apparatus Cases and Fixing of Equipments and other related works including Wiring, Testing and Commissioning in connection with RE modification of existing Central / End Panel Interlocking / EI at stations, provision of MACLS / RE modification of existing MACLS at L.C. Gates to suit 25 KV AC Traction in the following sections:- 1. KATWA – AZIMGANJ SECTION OF HOWRAH DIVISION OF EASTERN RAILWAY. 2. JANGIPUR ROAD – NEW FARAKKA SECTION OF MALDA DIVISION OF EASTERN |
KWAE-AZ-NFK-SIG-KKK-OT-23 dated 13.12.2017 (Signalling) | 4.14 Corers | Work in Progress Station commissioned on 26.07.2019 |
11 | Supply, Installation, Wiring, Testing & Commissioning work- of S&T Equipments for modification of In-Plant Yard to provide Additional Track Hopper and Wagon Tippler for 2x500 MW expansion of Sagardighi Thermal Power Plant (Phase-II) near Manigram Station of Malda Division in Eastern Railway, Dist. Murshidabad, West Bengal | C.A. No.- RITES/RPO-KOL/WBPDCL-Sg.TPP/Phase-II/S&T/ 2015/467 Dt. 20.02.2017 (Signalling) | 2.85 Crores | Work in Progress Commissioned on 08.05.2019 |
12 | Supply & Execution of Balance work remaining for commissioning work to serve M/s Khatau Narbheram & Co. at Bolani khadan , Barbil under Chakradharpur Division, South Eastern Railway. | LOA NO. KNC/PSE/LOI/Supply/18-19/008 & KNC/PSE/LOI/Service/18-19/009 Dt. 07.03.2019 (Signalling) | 2.57 Crores | Work in Progress |
13 | Modification of Existing E.I at Barbil station for M/s. Rungta Mines ltd. | LOI NO. RML/PUR/2019-20/9239 Dt. 04.12.2019 (Signalling) | 4.10 Crores | Just Initiated |
14 | Supply, installation, testing & commissioning of STM, Muxs and OFC Link & Supply, Installation, Testing & commissioning of Way station equipments, Head quarter control equipments with power supplies, Emergency sockets etc in SP/SSP/TSS including Trenching, Laying, Jointing of 6-Quad/PIJF cable for SP/SSP/TSS etc in PAKUR-MALDA & ANDAL-SITARAMPUR VIA JAMURIA-IKRA & SRIPUR Section of Eastern Railway. | C.A. No. CORE/S&T/TELE/9041/PKR-MLDT & UDL-STN Dated 10.08.2015 (Signalling) | 2.26 Crores Revised Value 3.25 Crore | 60% Commissioned Rest under progress Delay due to side clearance |
15 | Supply, installation, testing & commissioning of STM, Muxs and OFC Link & Supply, Installation, Testing & commissioning of Way station equipments, Head quarter control equipments with power supplies, Emergency sockets etc in SP/SSP/TSS including Trenching, Laying, Jointing of 6-Quad/PIJF cable for SP/SSP/TSS etc in PAKUR-MALDA & ANDAL-SITARAMPUR VIA JAMURIA-IKRA & SRIPUR Section of Eastern Railway. | C.A. No. CORE/S&T/TELE/9041/PKR-MLDT & UDL-STN Dated 10.08.2015 (Signalling) | 2.26 Crores Revised Value 3.25 Crore | 60% Commissioned Rest under progress Delay due to side clearance |
16 | Operation and Maintenance of Emami Cement Ltd. Siding | P.O No- 4900024007 Dated: 23.10.2018 | 1.23 Crores | Work in Progress |
17 | New loop line at Gokulpur-Nimpura West cabin to serve M/s Orissa Metalik Private Limited. | P.O No- O219216042 Dated: 15.06.2019 S.O No.- O219350923 | 72 Lacs | Work in Progress Commissioned on 10.11.19 |
18 | Supply, Installation and commissioning of S&T M/s Essel Mining Industries Ltd. at Apahatu Siding. As per “Party” and collectively as work order. | WO/CPC/EMIL/CAPEX/2019-20/05 Dt. 17.07.2019 (Signalling) | 45.51 Lacs | Work in Progress |
19 | Work Order for Supply and Execution of OHE works M/s Orissa Industries Ltd. at Lathikata. | WO/ORIND/2019-20 Dt. 26.09.2019 (OHE) | 1.67 Cr. | Work in Progress |
20 | Signalling & Telecommunication work for Railway siding job at Jharkhand Cement Plant (A unit of Shree Cement Limited) | WO NO. SCL/CC/Jharkhand/19-20/WO-156 dt. 07.09.2019 (Signalling) | 11.75 Crores | Work in Progress |
21 | Supply & Erection and Commissioning of P-way work at Cuttack Cement Works of M/s. Ultra Tech Cement Limited | PO No. CPC/MUM/AEB/CUTTACK/WO-06/2019-20 DT. 09.12.19 (Signalling | 19.50 Crores | Work in Progress |
22 | M/s. JSW Cement Ltd., at Salboni. (Signalling) | 14 Crores | Commissioned | |
23 | M/s. Sridhi Transport at Ranital. Length of siding 4.5 K.m (Civil, signallig & OHE work) | 10.50 Crores | Under commissioning | |
24 | M/s. EMAMI CEMENT LTD at Panagarh station in Asansol Division of Eastern Railway. Length of siding 10.2 K.m (Civil, signallig & OHE work) | 65 Crores. | Siding Commissioned | |
25 | M/s. Ulatra Tech Cement Ltd. at Janai Road. ( Signalling) | 20 Crores | Commissioned | |
26 | M/s. NOCCI Balasore Infrastructure at Balasore under Kharagpur Division of South Eastern Railway.” Length of siding 3.2 K.m (Civil, signallig & OHE work) | 19.60 Crores. | Siding Commissioned |